§ 102-436. Setbacks and buffering.  


Latest version.
  • Setback requirements within the PUD shall be flexible; however, in no case shall the setback be less than 15 feet between structures or zero-lot-line if structures abut. Buffering requirements shall be those set out later in this land development code.

(LDC 1997, ch. 3, § 1.06(n)(5); Ord. No. 2005-26, § 1, 10-11-2005)